Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HPC-TANM-RNQEP
Current Status: Deemed Complete
SubVersionID: 2930c1e7-f162-4812-a8fa-1d3d6bcbc6e3
Location: 800 feet from the Berlin- Barre City line along US 302
Caller Name And Title: Bill Ahearn
Incident Start Date: 10/28/2021
Incident End Date: 10/28/2021
Contact Name And Title For Public: Bill Ahearn Director of Public Works
Public Contact Phone Number: 8024760250
Incident Start Time: 12:00 pm
Incident End Time: 03:00 pm
Estimated Volume: Under 100 gallons
Nature Of Incident: Discharged untreated sewage
Cause Of Discharge: Mechanical Failure
Type Of Obstruction: Minor annular leakage around an existing compression plug.
Point Of Discharge: Crack/hole in pipe
Corrective Action Taken: A second plug was added to pump station overflow.
Waterbody Impacted: Stevens Branch
Description Of Incident: Unconfirmed raw sewage release, presumed to occur from a leaking mechanical plug. The incident was concluded by the installation of two sequential plugs in the pipe. Under the presumption, the leak was from that source.