Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HP1-RTS5-33R89
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
a4c244d1-b4c3-4d19-9075-ff556bb1e04c
|
Location:
|
Macdonough Dr. Pump Station metered overflow structure
|
Caller Name And Title:
|
Rick Chaput, Chief Operator
|
Incident Start Date:
|
8/4/2020
|
Incident End Date:
|
8/4/2020
|
Contact Name And Title For Public:
|
Rick Chaput, Chief Operator
|
Public Contact Phone Number:
|
8028772931
|
Incident Start Time:
|
07:40 pm
|
Incident End Time:
|
09:30 pm
|
Estimated Volume:
|
37,800
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
Otter Creek belowt the falls in Vergennes
|
Description Of Incident:
|
High flows caused by an intense rain storm on August 4th 2020 resulted in the discharge of a combination of sewage and stormwater from CSO #002. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|