Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HNQ-NRW0-S85M6
Current Status: Deemed Complete
SubVersionID: c041b04e-5438-4c93-a1dd-a65329e91b28
Location: Pine Street CSO
Caller Name And Title: Matthew Dow, Wastewater Facilities Manager
Incident Start Date: 6/20/2019
Incident End Date: 6/20/2019
Contact Name And Title For Public: Megan Moir, Div. Head, Water Resources
Public Contact Phone Number: 802.863.4501
Incident Start Time: 01:23 pm
Incident End Time: 03:18 pm
Estimated Volume: 177,396 Gallons
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: none
Waterbody Impacted: Pine Street CSO
Description Of Incident: High flows caused by an intense rain storm on June 20th resulted in the discharge of a combination of sewage and stormwater from the Pine Street CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Of the 177,396 gallons that overflowed, 23,374 gallons are calculated to be the sewer component.