Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HNQ-NQ9B-TW9WK
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
b9500b25-ca21-4e64-a14f-d043f1bb87a5
|
Location:
|
CSO"s#16,11,10a,9,6,6a,27,21
|
Caller Name And Title:
|
Hugh Wescott
|
Incident Start Date:
|
6/20/2019
|
Incident End Date:
|
6/20/2019
|
Contact Name And Title For Public:
|
Hugh Wescott
|
Public Contact Phone Number:
|
802-751-9107
|
Incident Start Time:
|
02:00 pm
|
Incident End Time:
|
04:00 pm
|
Estimated Volume:
|
1,000 to 10,000 gallons
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
none
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
Passumpsic River
|
Description Of Incident:
|
High flows caused by an intense rain storm on 6/20/2019 resulted in the discharge of a combination of sewage and stormwater from CSOCSO"s#16,11,10a,9,6,6a,27,21 these are an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|