Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HNQ-EBC1-0RYQ3
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
95119f3d-716e-4b96-ab24-e05797a4ef9b
|
Location:
|
cso #016
|
Caller Name And Title:
|
Hugh Wescott Public Works Director
|
Incident Start Date:
|
6/11/2019
|
Incident End Date:
|
6/11/2019
|
Contact Name And Title For Public:
|
Hugh Wescott Public Works Director
|
Public Contact Phone Number:
|
802-751-9107
|
Incident Start Time:
|
04:00 am
|
Incident End Time:
|
06:15 am
|
Estimated Volume:
|
1,000 to 10,000 gallons
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
none
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
none
|
Waterbody Impacted:
|
Passumpsic River
|
Description Of Incident:
|
High flows caused by an intense rain storm on 6/11/2019 resulted in the discharge of a combination of sewage and stormwater from CSO #016. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|