Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HNP-1ZVE-43MJ9
Current Status: Deemed Complete
SubVersionID: 244c9cc5-e524-43ed-ac31-963736d6687f
Location: Adams Street Pump Station
Caller Name And Title: Peter Laramie, Chief Operator
Incident Start Date: 4/15/2019
Incident End Date: 4/16/2019
Contact Name And Title For Public: Peter Laramie
Public Contact Phone Number: 802-265-3544
Incident Start Time: 01:58 pm
Incident End Time: 03:30 pm
Estimated Volume: 10,000 to 100,000 gallons
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction: None
Point Of Discharge: Pump station emergency overflow pipe
Corrective Action Taken: None
Waterbody Impacted: Castleton River
Description Of Incident: High flows caused by an intense rain storm on April 15, 2019 resulted in the discharge of a combination of sewage and stormwater from CSO-001 at Adams Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.