Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HNP-1ZVE-43MJ9
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
244c9cc5-e524-43ed-ac31-963736d6687f
|
Location:
|
Adams Street Pump Station
|
Caller Name And Title:
|
Peter Laramie, Chief Operator
|
Incident Start Date:
|
4/15/2019
|
Incident End Date:
|
4/16/2019
|
Contact Name And Title For Public:
|
Peter Laramie
|
Public Contact Phone Number:
|
802-265-3544
|
Incident Start Time:
|
01:58 pm
|
Incident End Time:
|
03:30 pm
|
Estimated Volume:
|
10,000 to 100,000 gallons
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Pump station emergency overflow pipe
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Castleton River
|
Description Of Incident:
|
High flows caused by an intense rain storm on April 15, 2019 resulted in the discharge of a combination of sewage and stormwater from CSO-001 at Adams Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|