Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HNF-WQDE-QQDD2
Current Status: Deemed Complete
SubVersionID: 7b443e80-29e3-4a81-9636-9a08d2744e95
Location: Pine St. CSO
Caller Name And Title: Matthew Dow, Wastewater Facilities Manager
Incident Start Date: 8/7/2018
Incident End Date: 8/7/2018
Contact Name And Title For Public: Megan Moir, Div. Head, Water Resources
Public Contact Phone Number: 802.863.4501
Incident Start Time: 04:15 pm
Incident End Time: 05:03 pm
Estimated Volume: 15,250
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: None
Waterbody Impacted: Pine Street Barge Canal
Description Of Incident: High flows caused by an intense rain storm on 8/7/2018 resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine Street. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.