Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HNF-K02X-C3RH8
Current Status: Deemed Complete
SubVersionID: e9b80bff-2d4f-4acd-bfb1-3aebc733fca2
Location: Park St CSO
Caller Name And Title: Matthew Dow
Incident Start Date: 7/25/2018
Incident End Date: 7/25/2018
Contact Name And Title For Public: Megan Moir, Div Head Water Resources
Public Contact Phone Number: 8028634501
Incident Start Time: 09:25 pm
Incident End Time: 10:00 pm
Estimated Volume: 14,397
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: none
Waterbody Impacted: Intervale Wetlands
Description Of Incident: High flows caused by an intense rain storm on 7/25/2018 resulted in the discharge of a combination of sewage and stormwater from Park St. CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.