Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HNF-JXH1-ANKKB
Current Status: Deemed Complete
SubVersionID: 68800e36-56c1-4ae2-9f46-5d7e830f8a42
Location: Lower Weldon CSO Structure
Caller Name And Title: Brian Burns
Incident Start Date: 07/25/2018
Incident End Date: 07/25/2018
Contact Name And Title For Public: Allen Robtoy
Public Contact Phone Number: 802-524-1500
Incident Start Time: 09:15 am
Incident End Time: 11:30 pm
Estimated Volume: 293,300
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: None
Waterbody Impacted: Stevens Brook
Description Of Incident: High flows caused by an intense rain storm on (07/25/2018) resulted in the discharge of a combination of sewage and stormwater from CSO (Lower Weldon). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.