Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HNF-JHC6-ZN934
|
|
Current Status:
|
Deemed Complete
|
|
SubVersionID:
|
817ad6eb-ea07-411e-ba18-d87d30a69b1e
|
|
Location:
|
Third Base: Meadow Street CSO#003 and School Street CSO#004
|
|
Caller Name And Title:
|
Rod Munroe/ Lab Director
|
|
Incident Start Date:
|
7/25/2018
|
|
Incident End Date:
|
7/25/2018
|
|
Contact Name And Title For Public:
|
Jeff Wennberg, Commissioner of Public Works, City of Rutland
|
|
Public Contact Phone Number:
|
802-773-1813
|
|
Incident Start Time:
|
10:50 am
|
|
Incident End Time:
|
01:16 pm
|
|
Estimated Volume:
|
70,043 gallons
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
None
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
none
|
|
Waterbody Impacted:
|
East Creek
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 07/25/18 resulted in the discharge of a combination of sewage and stormwater from CSO#009- School and Meadow Street combined, CSO#003 and #004. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. In addition, 2,919,042 gallons of urban storm water was treated through the wastewater treatment plant that would have otherwise gone into the receiving stream.
|