Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HNF-GWW7-T84QP
|
|
Current Status:
|
Deemed Complete
|
|
SubVersionID:
|
01fe4aa5-b64a-4608-bc94-276c5d769d8c
|
|
Location:
|
Third Base (includes CSO #003 and CSO #004)
|
|
Caller Name And Title:
|
Jeff Wennberg, Commissioner
|
|
Incident Start Date:
|
7/23/2018
|
|
Incident End Date:
|
7/23/2018
|
|
Contact Name And Title For Public:
|
Jeff Wennberg, Commissioner
|
|
Public Contact Phone Number:
|
802-773-1813
|
|
Incident Start Time:
|
10:41 am
|
|
Incident End Time:
|
02:06 pm
|
|
Estimated Volume:
|
3,368,463 gallons
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
Public notice via social media
|
|
Waterbody Impacted:
|
East Creek
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 7/23/18 (1.95" rain over 2.5 hours - max rate, 3.56 in/hr) resulted in the discharge of a combination of sewage and stormwater from CSOs #003 and #004. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. Of this total 3,200,040 gallons are estimated to be stormwater and 168,423 gallons wastewater.
|