|
Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HNE-NCP7-BVYDG
|
|
Current Status:
|
Deemed Complete
|
|
SubVersionID:
|
e27a7f78-4666-4d03-ba4e-6f5f7042dd11
|
|
Location:
|
Pine Street CSO
|
|
Caller Name And Title:
|
Matthew Dow
|
|
Incident Start Date:
|
06/18/2018
|
|
Incident End Date:
|
06/18/2018
|
|
Contact Name And Title For Public:
|
Megan Moir, Div. Head Water Resources
|
|
Public Contact Phone Number:
|
8028634501
|
|
Incident Start Time:
|
03:11 pm
|
|
Incident End Time:
|
03:44 pm
|
|
Estimated Volume:
|
Approximately 25,000
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
In an effort to reduce overflows from the Pine St CSO, the City has disconnected some upstream catch basins from the sewer system and is developing a long term plan to eliminate this CSO.
|
|
Waterbody Impacted:
|
Pine Street Barge Canal
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 6/18/2018 resulted in the discharge of a combination of sewage and stormwater from the CSO located on Pine St. This CSO is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. The sewage component is estimated to be approximately 1,200 gallons.
|