|
Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HNE-NCJZ-71077
|
|
Current Status:
|
Deemed Complete
|
|
SubVersionID:
|
69b3e915-7369-485c-acae-53c63592a592
|
|
Location:
|
Gazo CSO
|
|
Caller Name And Title:
|
Matthew Dow, Wastewater Facilities Manager
|
|
Incident Start Date:
|
06/18/2018
|
|
Incident End Date:
|
06/18/2018
|
|
Contact Name And Title For Public:
|
Megan Moir, Div Head Water Resources
|
|
Public Contact Phone Number:
|
8028634501
|
|
Incident Start Time:
|
01:49 pm
|
|
Incident End Time:
|
01:50 pm
|
|
Estimated Volume:
|
less than 200
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
|
Cause Of Discharge:
|
High Flows
|
|
Type Of Obstruction:
|
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
None
|
|
Waterbody Impacted:
|
Winooski River
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 6/18/2018 resulted in the discharge of a combination of sewage and stormwater from Gazo CSO. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings. We estimate the sewer portion to be less than 10 gallons.
|