Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HN7-9Q1H-ZSX9T
Current Status: Deemed Complete
SubVersionID: 7306485b-6cc8-4c0c-bd10-7e832c981f0f
Location: Pine St. CSO
Caller Name And Title: Matthew Dow, Wastewater Facilities Manager
Incident Start Date: 08/22/2017
Incident End Date: 08/22/2017
Contact Name And Title For Public: Megan Moir, Water Resources Div. Head
Public Contact Phone Number: 8028634501
Incident Start Time: 06:15 pm
Incident End Time: 07:23 pm
Estimated Volume: 10,000 to 100,000 gallons
Nature Of Incident: Discharged untreated sewage
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: In an effort to reduce overflows from Pine Street CSO, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.
Waterbody Impacted: Pine St. Barge Canal
Description Of Incident: High flows caused by an intense rain storm on August 22nd resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.