Newly Reported Overflow
|
|
|
Facility Name:
|
|
|
Facility Number:
|
|
|
PermitID:
|
|
|
Submission Number:
|
HN7-42JB-81B7Z
|
|
Current Status:
|
Deemed Complete
|
|
SubVersionID:
|
7912e7d0-a89e-4f97-a987-2b9ee076f6b8
|
|
Location:
|
At CSO outfall #5 . S/N 004 . North end of old J&L Building on Clinton Street
|
|
Caller Name And Title:
|
Richard LeDrew , Assistant Chief operator
|
|
Incident Start Date:
|
08/15/2017
|
|
Incident End Date:
|
08/15/2017
|
|
Contact Name And Title For Public:
|
Richard LeDrew , assistant chief operator, wwtp
|
|
Public Contact Phone Number:
|
1-802-885-2854
|
|
Incident Start Time:
|
12:30 pm
|
|
Incident End Time:
|
01:30 pm
|
|
Estimated Volume:
|
1,000 to 10,000 gallons
|
|
Nature Of Incident:
|
Discharged untreated sewage
|
|
Cause Of Discharge:
|
Other - Please describe in Description of Incident
|
|
Type Of Obstruction:
|
n/a
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
|
Corrective Action Taken:
|
There was an additional length of pipe added to the discharge line and the outfall pipe was plugged.
|
|
Waterbody Impacted:
|
Black River
|
|
Description Of Incident:
|
During construction work being done it was necessary to set up bypass pumping equipment. The contractor discharged the flow into the basin which is one of our CSO outfall basins . It was told to me that all the flow was initially going into the bottom of the basin and onto the treatment plant. At some point the discharge pipe shifted and was flowing partially into the outfall pipe. I would estimate it was a 50/50 split. The bypass pump had only been in operation for approximately 1 hr. This problem was immediately corrected with very minimal flow to the river.
|