Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HN6-D56V-SRTTM
Current Status: Deemed Complete
SubVersionID: d1006565-1cb9-4954-a274-d107a1ec4326
Location: Pine Street CSO
Caller Name And Title: Matthew Dow, Chief Operator
Incident Start Date: 07/17/2017
Incident End Date: 07/17/2017
Contact Name And Title For Public: Megan Moir, Water Resources Div Head
Public Contact Phone Number: 8028634501
Incident Start Time: 10:52 am
Incident End Time: 11:31 am
Estimated Volume: 10,000 to 100,000 gallons
Nature Of Incident: Discharged untreated sewage
Cause Of Discharge: High Flows
Type Of Obstruction:
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: In an effort to reduce overflows from Pine Street CSO, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.
Waterbody Impacted: Pine Street Barge Canal
Description Of Incident: High flows caused by an intense rain storm on July 17th resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.