Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HN6-D56V-SRTTM
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
d1006565-1cb9-4954-a274-d107a1ec4326
|
Location:
|
Pine Street CSO
|
Caller Name And Title:
|
Matthew Dow, Chief Operator
|
Incident Start Date:
|
07/17/2017
|
Incident End Date:
|
07/17/2017
|
Contact Name And Title For Public:
|
Megan Moir, Water Resources Div Head
|
Public Contact Phone Number:
|
8028634501
|
Incident Start Time:
|
10:52 am
|
Incident End Time:
|
11:31 am
|
Estimated Volume:
|
10,000 to 100,000 gallons
|
Nature Of Incident:
|
Discharged untreated sewage
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
In an effort to reduce overflows from Pine Street CSO, the city has disconnected some up stream stormwater catch basins from the sewer system, and is developing a long term plan to eliminate this CSO.
|
Waterbody Impacted:
|
Pine Street Barge Canal
|
Description Of Incident:
|
High flows caused by an intense rain storm on July 17th resulted in the discharge of a combination of sewage and stormwater from CSO at Pine Street CSO. This discharge is intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|