Vermont Watershed Management in DEC at ANR


Newly Reported Overflow
Facility Name:
Facility Number:
PermitID:
Submission Number: HN5-ZY97-DFN8X
Current Status: Deemed Complete
SubVersionID: 9482cb4f-5200-469f-a8c0-6089db9295f4
Location: CSO 001 - Taylor St. Bridge
Caller Name And Title: Christopher Cox - Chief Operator
Incident Start Date: 06/29/2017
Incident End Date: 06/30/2017
Contact Name And Title For Public: Kurt Motyka
Public Contact Phone Number: 802-223-9508
Incident Start Time: 08:00 pm
Incident End Time: 04:00 pm
Estimated Volume: 1,000 to 10,000 gallons
Nature Of Incident: Authorized Wet Weather CSO Overflow
Cause Of Discharge: High Flows
Type Of Obstruction: None
Point Of Discharge: Combined sewer overflow structure
Corrective Action Taken: None
Waterbody Impacted: Winooski
Description Of Incident: High flows caused by an intense rain storm on 6/29/17 -6/30/17 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.