Newly Reported Overflow
|
|
Facility Name:
|
|
Facility Number:
|
|
PermitID:
|
|
Submission Number:
|
HN3-XKAG-9090M
|
Current Status:
|
Deemed Complete
|
SubVersionID:
|
66430310-e062-4cc6-9def-0abd0164ddb7
|
Location:
|
Lower Weldon CSO Structure
|
Caller Name And Title:
|
Briab Burns
|
Incident Start Date:
|
4/6/2017 4:00:00 AM
|
Incident End Date:
|
4/7/2017 4:00:00 AM
|
Contact Name And Title For Public:
|
Allen Robtoy
|
Public Contact Phone Number:
|
802-524-1500
|
Incident Start Time:
|
02:30 pm
|
Incident End Time:
|
05:00 am
|
Estimated Volume:
|
Greater than 1,000,000 gallons
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Stevens Brook
|
Description Of Incident:
|
High flows caused by an intense rain storm on (4/6/2017) resulted in the discharge of a combination of sewage and stormwater from CSO (At lower Weldon cso structure). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|