Facility Name:
|
Wilmington
|
|
|
John Lazelle, Chief Operator
|
|
|
Town of Wilmington
|
|
|
Beaver Brook
|
|
|
08/15/2022
|
|
|
08/15/2022
|
|
|
03:00 am to 06:00 am
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
>1,000 to 10,000 gallons
|
|
|
Obstruction/Blockage
|
|
|
Wipes
|
|
|
Manhole
|
|
|
We used our sewer jetter to unclog the main sewer line just upstream of Pump Station #1. Flow was back to normal at approx. 6:00 a.m.
|
|
|
Beaver Brook / Deerfield River
|
|
|
John Lazelle, Chief Operator
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
At 4:11 a.m. we received an alarm indicating flow discharge flow at the treatment plant. Upon investigation, a clog was found just upstream of Pump Station #1. The low point manhole located in Beaver Brook was checked and wastewater was leaking out of the manhole into the brook.
|
|
|
|
|
|