View FacilityIncident Record


Facility Name: Wilmington    
John Lazelle, Chief Operator    
Town of Wilmington    
Treatment Plant - 59 Fairview Avenue    
10/30/2017    
10/30/2017    
10:45 am to 02:28 pm    
   
Discharged treated and partly disinfected effluent    
100,000    
Obstruction/Blockage    
plastic/leaves    
Other    
Static mixers were taken out and inspected for blockages. All piping was clear. Had to continue to let the effluent overflow from contact tank inspection hatch or lagoons would overflow!    
North Branch of the Deerfield River    
John Lazelle, Chief Operator    
10/30/2017    
Nicholas Giannetti    
nForms    
Y    
   
   
   
The Wilmington WWTF received approximately 7" of rain into the morning of October 30th, causing the wastewater lagoons to reach capacity. Wastewater effluent flowing through the chlorine contact pipe surcharged the contact pipe through an inspection hatch prior to the dechlorination chamber. It was believed that the back-up occurred due to the high flows coupled with debris caught on the dechlorination static mixers, causing a back-up of fully treated and disinfected effluent through the inspection hatch. This back-up resulted in approximately 100,000 gallons of treated and disinfected wastewater flowing overland to the North Branch of the Deerfield River. The lagoons did not overflow.    
   