|
Facility Name:
|
Stowe
|
|
|
Bryan Longe - Chief Operator
|
|
|
Town Of Stowe
|
|
|
Lower Village Pumping Station
|
|
|
11/01/2019
|
|
|
11/01/2019
|
|
|
05:00 am to 11:20 am
|
|
|
|
|
|
Other
|
|
|
>10,000 to 100,000 gallons
|
|
|
Other
|
|
|
|
|
|
Other
|
|
|
An Electrician was called in to try and repair the control panel.
Xylem was also called and a portable pump was rented.
|
|
|
Little River
|
|
|
Harry Shepard - Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
The Little River jumped it's banks and flooded the pumping station taking out the pump controls.
|
|
|
|
|
|
HNT-YVYT-1FWR5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|