|
Facility Name:
|
Montpelier
|
|
|
Chris Cox- Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 001- Taylor St Bridge
|
|
|
06/18/2026
|
|
|
06/18/2026
|
|
|
02:45 pm to 03:55 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
87951
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 6/18/2026 resulted in the discharge of a combination of sewage and stormwater from CSO 001-Taylor St. Bridge. This is an authorized discharge intended to protect the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQP-DZY2-3H6KQ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|