|
Facility Name:
|
Montpelier
|
|
|
Chris Cox- Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 003- Bailey Ave
|
|
|
06/18/2026
|
|
|
06/18/2026
|
|
|
02:20 pm to 03:50 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
36458
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 6/18/2026 resulted in the discharge of a combination of sewage and stormwater from CSO 003- Bailey Ave. This is an authorized discharge intended to protect the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQP-E02Y-P37AC
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|