Facility Name:
|
Montpelier
|
|
|
Chris Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 003 - Baily Ave
|
|
|
05/30/2026
|
|
|
05/30/2026
|
|
|
07:30 am to 08:20 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
5000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Moytka - Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 5/30/2026 resulted in the discharge of a combination of sewage and stormwater from CSO 003 Baile Ave. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQN-YA3E-WSXD1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|