Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Montpelier    
Christopher Cox - Chief Operator    
City of Montpelier    
CSO 001 - Taylor St. Bridge    
03/12/2026    
03/12/2026    
06:40 am to 10:10 am    
   
Authorized Wet Weather CSO Overflow    
130818    
High Flows    
None.    
Combined sewer overflow structure    
None.    
Winooski River    
Kurt Motyka - Public Works Director    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain and snow melt on 3/12/26 resulted in the discharge of a combination of sewage and stormwater from CSO 001 Taylor St. Bridge. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   
HQM-0B8G-SS6DT