Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Montpelier    
Christopher cox - Chief Operator    
City of Montpelier    
CSO 001 - Taylor st Bridge    
05/16/2025    
05/16/2025    
11:00 pm to 11:35 pm    
   
Authorized Wet Weather CSO Overflow    
56256    
High Flows    
none    
Combined sewer overflow structure    
None    
Winooski River    
Kurt Moytka - Public Works Director    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 5/16/0225 resulted in the discharge of a combination of sewage and stormwater from CSO 001 Taylor St Bridge. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings    
   
HQC-N6MV-4CWJ6