Facility Name:
|
Montpelier
|
|
|
Chris Cox- Chief Operator
|
|
|
Montpelier
|
|
|
CS0 001-Taylor St Bridge
|
|
|
04/03/2025
|
|
|
04/03/2025
|
|
|
08:20 am to 12:20 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
53115
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by an intense rain storm on 4/3/2025 resulted in the discharge of a combination of sewage and stormwater from CSO 001 -Taylor St. Bridge. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQB-JV2B-HTZJ5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|