Facility Name: Montpelier    
Christopher Cox - Chief Operator    
City of Montpelier    
CSO 003 - Bailey Ave    
03/16/2025    
03/19/2025    
04:15 pm to 02:05 pm    
   
Authorized Wet Weather CSO Overflow    
100000    
High Flows    
Rocks    
Combined sewer overflow structure    
Water/Sewer Department cleaned the sewer line downstream of the overflow weir.    
Winooski River    
Kurt Motyka - Public Works Director    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 3/16/25 resulted in the discharge of a combination of sewage and stormwater from CSO 00 3 -Bailey Ave. The overflow event was prolonged due to high sewer flows carrying rocks and other debris downstream of the overflow structure, which then accumulated and caused a partial blockage of the sewer line. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.    
   