Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 003 - Bailey Ave
|
|
|
03/16/2025
|
|
|
03/19/2025
|
|
|
04:15 pm to 02:05 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
100000
|
|
|
High Flows
|
|
|
Rocks
|
|
|
Combined sewer overflow structure
|
|
|
Water/Sewer Department cleaned the sewer line downstream of the overflow weir.
|
|
|
Winooski River
|
|
|
Kurt Motyka - Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 3/16/25 resulted in the discharge of a combination of sewage and stormwater from CSO 00 3 -Bailey Ave. The overflow event was prolonged due to high sewer flows carrying rocks and other debris downstream of the overflow structure, which then accumulated and caused a partial blockage of the sewer line. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQB-72JQ-RGFSD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|