Facility Name:
|
Montpelier
|
Caller Name And Title:
|
Christopher Cox - Chief Operator
|
Municipality:
|
City of Montpelier
|
Location (street or site):
|
CSO 003 - Bailey Ave
|
Incident Start Date:
|
03/16/2025
|
Incident End Date:
|
03/19/2025
|
Incident Start End Times:
|
04:15 pm to 02:05 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
100000
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
Rocks
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
Water/Sewer Department cleaned the sewer line downstream of the overflow weir.
|
Waterbody Impacted:
|
Winooski River
|
Contact Name And Title For Public:
|
Kurt Motyka - Public Works Director
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 3/16/25 resulted in the discharge of a combination of sewage and stormwater from CSO 00 3 -Bailey Ave. The overflow event was prolonged due to high sewer flows carrying rocks and other debris downstream of the overflow structure, which then accumulated and caused a partial blockage of the sewer line. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HQB-72JQ-RGFSD
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|