|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox- Chief operator
|
|
|
Montpelier
|
|
|
CSO 01- Taylor St Bridge
|
|
|
03/16/2025
|
|
|
03/17/2025
|
|
|
05:20 pm to 02:35 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
204391
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 3/16/25 resulted in the discharge of a combination of sewage and stormwater from CSO 01- Taylor St Bridge. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings,
|
|
|
|
|
|
HQB-5HJS-253CQ
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|