|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 003 -Bailey Ave
|
|
|
08/09/2024
|
|
|
08/12/2024
|
|
|
06:55 pm to 11:10 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
100000
|
|
|
High Flows
|
|
|
Rocks, wood, and trash
|
|
|
Combined sewer overflow structure
|
|
|
City's vactor used to clear debris to help stop overflow event.
|
|
|
Winooski River
|
|
|
Kurt Motyka - Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8/9/2024 resulted in the discharge of a combination of sewage and stormwater from CSO 003 - Bailey Ave. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ5-TWP3-AS39R
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|