|
Facility Name:
|
Montpelier
|
|
|
Chris Cox-Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO-007 10 Main St
|
|
|
08/11/2024
|
|
|
08/11/2024
|
|
|
07:50 pm to 08:20 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
13330
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
North Branch
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8/11/2024 resulted in the discharge of a combination of sewage and stormwater from CSO-007 (10 Main St.). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ5-TRS1-PZQ2P
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|