|
Facility Name:
|
Montpelier
|
|
|
Chris Cox- Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO-007 (10 Main St siphon)
|
|
|
08/09/2024
|
|
|
08/09/2024
|
|
|
07:00 pm to 07:15 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
1000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
North Branch
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rainstorm on 8/9/24 resulted in the discharge of a combination of sewage and stormwater from CSO-007 (10 Main St). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ5-S61E-TGNRK
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|