|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 008 -Intersection of Main/Baree
|
|
|
07/11/2024
|
|
|
07/11/2024
|
|
|
12:40 am to 04:40 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
614000
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None.
|
|
|
North Branch
|
|
|
Kurt Motyka - Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 07/10/2024 resulted in the discharge of a combination of sewage and stormwater from CSO 008 -Intersection of Main/Barre. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ5-1VMZ-8NVEV
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|