|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox- Chief Operator
|
|
|
City Of Montpelier
|
|
|
CSO-009 152 Main St
|
|
|
07/11/2024
|
|
|
07/11/2024
|
|
|
10:50 am to 12:45 pm
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
136000
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
North Branch
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High Flows caused by an intense storm on 7/10/24-7/11/24 resulted in the discharge of a combination of sewage and stormwater from CSO-009 (152 Main St). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent the backups into homes and other buildings.
|
|
|
|
|
|
HQ5-2CNF-TGSY0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|