|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox-Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO-003 Bailey Ave
|
|
|
01/26/2024
|
|
|
01/26/2024
|
|
|
07:25 am to 10:55 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka-Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by a rain even and snow melt on 1/26/2024 resulted in the discharge of a combination of sewage and stormwater from CSO-003 (Bailey Ave). This is authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ0-YKY2-D7833
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|