|
Facility Name:
|
Montpelier
|
|
|
Chris Cox-Chief Operator
|
|
|
City Of Montpelier
|
|
|
CSO 009- 152 Main St
|
|
|
12/18/2023
|
|
|
12/19/2023
|
|
|
06:10 am to 02:45 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
2189156 Gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
North Branch
|
|
|
Kurt Motyka-Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by and intense rain storm on 12/18/23 resulted in a combination of sewage and stormwater from CS0 009. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HQ0-0P7B-A8SCP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|