Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 002 - Bailey Ave Bridge (siphon)
|
|
|
08/30/2023
|
|
|
08/30/2023
|
|
|
10:45 am to 11:55 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
30,809 Gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka - Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 08/30/2023 resulted in the discharge of a combination of sewage and stormwater from CSO 023 - Bailey Ave Bridge (siphon). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|