|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 008 0 Intersection of Main / Barre
|
|
|
07/10/2023
|
|
|
07/13/2023
|
|
|
01:51 am to 06:54 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>1,000,000 gallons
|
|
|
High Flows
|
|
|
None.
|
|
|
Combined sewer overflow structure
|
|
|
None.
|
|
|
North Branch
|
|
|
Kurt Motyka - Public Works Direction
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on (insert date) resulted in the discharge of a combination of sewage and stormwater from CSO 008 - Intersection of Main / Barre. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HPW-2ZGE-4PZ97
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|