Facility Name:
|
Montpelier
|
|
|
Matt Lamson- Assistant Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 008- Intersection of Main/Barre
|
|
|
12/23/2022
|
|
|
12/23/2022
|
|
|
10:30 am to 11:30 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>1,000 to 10,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
North Branch
|
|
|
Kurt Motyka- Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 12/23/2022 resulted in the discharge of a combination of sewage and stormwater from CSO 008- Intersection of Main/Barre. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|