Waste Water Inventory Website
            Watershed Management Website Drinking Water Website Waste Management Website
View FacilityIncident Record


Facility Name: Montpelier    
Christopher Cox - Chief Operator    
City of Montpelier    
CSO 023 - Bailey Ave Bridge (siphon)    
09/19/2022    
09/20/2022    
01:51 pm to 01:51 am    
   
Authorized Wet Weather CSO Overflow    
>100 to 1,000 gallons    
High Flows    
None.    
Combined sewer overflow structure    
None.    
Winooski River    
Kurt Motyka - DPW Director    
   
   
nForms    
Y    
   
   
   
High flows caused by an intense rain storm on 9/19/22 resulted in the discharge of a combination of sewage and stormwater from CSO 023 - Bailey Ave Bridge (siphon). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings    
   
HPM-V08Y-D5Y47