Facility Name:
|
Montpelier
|
Caller Name And Title:
|
Christopher cox
|
Municipality:
|
City of Motpeliier
|
Location (street or site):
|
CSO - 001
|
Incident Start Date:
|
07/18/2021
|
Incident End Date:
|
07/18/2021
|
Incident Start End Times:
|
03:00 am to 04:00 pm
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>1,000 to 10,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Winooski
|
Contact Name And Title For Public:
|
Kurt Motyka - Deputy Public works director
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on July 18, 2021 resulted in the discharge of a combination of sewage and stormwater from CSO-001-Taylor St. Bridge. This is a authorized discharge intended to protect the sewer system, to prevent overflow from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HPA-A8MZ-0KM1G
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|