|
Facility Name:
|
Montpelier
|
|
|
Chris cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 003 - Bailey Ave
|
|
|
12/25/2020
|
|
|
12/26/2020
|
|
|
08:30 am to 01:30 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski river
|
|
|
Kurt Motyka - Deputy Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 12/25/2020 resulted in the discharge of a combination of sewer and stormwater from CSO 003. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into home and other buildings.
|
|
|
|
|
|
HP5-BDV1-F4E68
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|