Facility Name:
|
Montpelier
|
Caller Name And Title:
|
Chris Cox - Chief Operator
|
Municipality:
|
City of Montpelier
|
Location (street or site):
|
CSO 001 - Taylor St Bridge
|
Incident Start Date:
|
12/25/2020
|
Incident End Date:
|
12/26/2020
|
Incident Start End Times:
|
08:30 am to 01:30 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>100 to 1,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Winooski River
|
Contact Name And Title For Public:
|
Kurt Motyka - Deputy Public Works Directo
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on 12/25/2020 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system , to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings ..
|
|
|
nForm Submission Number:
|
HP5-BDK2-KQSM7
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|