Facility Name:
|
Montpelier
|
|
|
Chris Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 001 - Taylor St Bridge
|
|
|
12/25/2020
|
|
|
12/26/2020
|
|
|
08:30 am to 01:30 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
None
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka - Deputy Public Works Directo
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 12/25/2020 resulted in the discharge of a combination of sewage and stormwater from CSO 001. This is an authorized discharge intended to protect the sewer system , to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings ..
|
|
|
|
|
|