Facility Name:
|
Montpelier
|
Caller Name And Title:
|
Christopher Cox - Chief Operator
|
Municipality:
|
City of Montpelier
|
Location (street or site):
|
CSO 023 - Bailey Ave Bridge
|
Incident Start Date:
|
08/04/2020
|
Incident End Date:
|
08/05/2020
|
Incident Start End Times:
|
06:51 pm to 01:50 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Authorized Wet Weather CSO Overflow
|
Estimated Volume (gallons):
|
>100 to 1,000 gallons
|
Cause Of Discharge:
|
High Flows
|
Type Of Obstruction:
|
None
|
Point Of Discharge:
|
Combined sewer overflow structure
|
Corrective Action Taken:
|
None
|
Waterbody Impacted:
|
Winooski River
|
Contact Name And Title For Public:
|
Kurt Motyka - Deputy Public Works Director
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
High flows caused by an intense rain storm on (insert date) resulted in the discharge of a combination of sewage and stormwater from CSO 023 - Bailey Ave Bridge (siphon). This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
nForm Submission Number:
|
HP1-SDSH-GZRZS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|