Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
294 Barre Street
|
|
|
04/15/2019
|
|
|
04/15/2019
|
|
|
11:47 am to 01:30 pm
|
|
|
|
|
|
Discharged untreated sewage
|
|
|
100
|
|
|
Other
|
|
|
None
|
|
|
Other
|
|
|
Repaired sewer pipe joint .
|
|
|
Winooski River
|
|
|
Kurt Motyka
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
On Monday, April 15th 2019 an excavation company contracted by the City of Montpelier was working on replacing a water line on Barre Street. During excavation a sewer line was exposed. Excavation near the sewer line caused a joint on the sewer pipe to fail. Before the pipe could be replaced less then a 100 gallons of untreated sewage flowed to a swale that runs directly into the Winooski River. The failed sewage joint was repaired immediately.
|
|
|
|
|
|
HNP-1SNT-JR2V9
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|