Facility Name:
|
Montpelier
|
|
|
Christopher Cox - Chief Operator
|
|
|
City of Montpelier
|
|
|
949 Dog River Road
|
|
|
04/09/2019
|
|
|
04/09/2019
|
|
|
06:30 am to 07:05 am
|
|
|
|
|
|
Discharged partly treated undisinfected effluent
|
|
|
100
|
|
|
Crack/Hole in Pipe
|
|
|
None
|
|
|
Stormwater collection system
|
|
|
A temporary barrier of sandbags was built to redirect the partially treated undisinfected effluent flow towards a facility drain, which discharges into the secondary clarifier. This stopped the untreated discharge. A solution to the concrete channel leak is currently being worked on by the public works department.
|
|
|
Dog River
|
|
|
Kurt Motyka
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
At the Montpelier Water Resource Recovery Facility there is a concrete channel which directs primary effluent from the primary clarifiers to the aeration tanks. A leak was discovered coming from this concrete channel at 6:30 a.m on 04/09/2019. A portion of the partially treated undisinfected effluent was able to flow across the ground and into a stormwater drain located near Montpelier's department of public works garage. This stormwater drain flows directly into the Dog River.
|
|
|
|
|
|
HNN-WZRP-KDD54
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|