Facility Name:
|
Montpelier
|
|
|
Chris Cox- Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 001 Taylor St Bridge
|
|
|
03/15/2019
|
|
|
03/16/2019
|
|
|
03:00 pm to 01:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
none
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski
|
|
|
Kurt Motyka- Assistant Public Works Director
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by melting snow 3/15/2019 resulted in the discharge of a combination of sewage and stormwater from CSO 001- Taylor Street Bridge. This is an authorized discharge intended to protect the sewer system, to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|