|
Facility Name:
|
Montpelier
|
|
|
Christopher Cox- Chief Operator
|
|
|
City of Montpelier
|
|
|
CSO 001- Taylor St Bridge
|
|
|
08/18/2017
|
|
|
08/18/2017
|
|
|
07:00 am to 11:00 am
|
|
|
|
|
|
Authorized Wet Weather CSO Overflow
|
|
|
>100 to 1,000 gallons
|
|
|
High Flows
|
|
|
|
|
|
Combined sewer overflow structure
|
|
|
None
|
|
|
Winooski River
|
|
|
Kurt Motyka
|
|
|
|
|
|
|
|
|
nForms
|
|
|
Y
|
|
|
|
|
|
|
|
|
|
|
|
High flows caused by an intense rain storm on 8/18/2017 resulted in the discharge of a combination of sewage and stormwater from CSO 001-Taylor St Bridge. This is an authorized discharge intended to protect the sewer system to prevent overflows from other parts of the sewer system, and to prevent backups into homes and other buildings.
|
|
|
|
|
|
HN7-6DH2-SVPZA
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|