Facility Name: Shelburne 2 (Harbor Rd)    
Chris Robinson    
Town of Shelburne    
WWTF#2 - McCabes Brook    
08/19/2017    
08/19/2017    
   
   
Discharged treated and partly disinfected effluent    
>10,000 to 100,000 gallons    
Other    
NA    
WWTF outfall    
The Town has scheduled an electrician to replace the wire and breaker in the UV control panel.    
McCabe's Brook    
Chris Robinson, Water Quality Superintendent    
   
   
nForms    
Y    
   
   
   
The power wire feeding the UV system overheated and burned inside the UV control panel. The wire was temporarily repaired. From the time the operator was notified until the time the flow was terminated approximately 10,000 - 15,000 gallons of treated, non-disinfected effluent was discharged to McCabe's Brook. The total volume discharged that was non-disinfected effluent may be lower due to hydraulic throughput of disinfected plant water and UV channel volume. Plant water and UV channel volume is approximately 3,300 gallons.    
   
HN7-8KTN-F6E4Z