Facility Name:
|
Plainfield
|
Caller Name And Title:
|
Tristan MacGregor-Stewart
|
Municipality:
|
Town of Plainfield
|
Location (street or site):
|
Treatment plant
|
Incident Start Date:
|
03/25/2025
|
Incident End Date:
|
03/25/2025
|
Incident Start End Times:
|
11:10 am to 11:15 am
|
Estimated Duration Of Event:
|
|
Nature Of Incident:
|
Discharged partly treated undisinfected effluent
|
Estimated Volume (gallons):
|
2000
|
Cause Of Discharge:
|
Other
|
Type Of Obstruction:
|
|
Point Of Discharge:
|
WWTF outfall
|
Corrective Action Taken:
|
Sludge has been wasted out of the tank to lower the sludge blanket and the U.V. channel has been flushed and cleaned to ensure full disinfection.
|
Waterbody Impacted:
|
Winooski River
|
Contact Name And Title For Public:
|
Tristan MacGregor-Stewart
|
Call Date:
|
|
WW Staff Called:
|
|
Type Of Notification:
|
nForms
|
Public Overflow Report For Web:
|
Y
|
|
|
|
|
|
|
Description Of Incident:
|
While switching to one tank operation and pumping sludge into that tank the sludge blanket rose and at the end of decant cycle some of the sludge made it through the U.V. channel to the river.
|
|
|
nForm Submission Number:
|
HQB-BP4J-W75JP
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|